For the week of: 9/9/2024
What to expect this week:
• Bremik Construction to begin installing underground plumbing piping and electrical conduit for the new building.
• Site sanitary and stormwater system exploration is ongoing. Expect intermittent traffic delays along Highway 101 and Hospital Road in the coming weeks.
• Excavation and fine grading for the building footings scheduled to begin the week of 9/16.
Major milestones on the project:
• Aggregate pier installation was completed on 8/30.
• Temporary power service has been established at the site.
About the new Health Center and Pharmacy
• The new facility in Wheeler will replace the existing Nehalem Bay Health Center and Pharmacy and provide more than 16,000 square feet of space accommodating 15 exam and treatment rooms, a modern pharmacy, a dental suite, x-ray, behavioral health unit and a community room.
• The project is being developed by the Nehalem Bay Health District and the District will own the building.
• Medical personnel and services will be provided by the local non-profit Nehalem Bay Health Center that will lease the new facility from the District.
Have questions?
• Email the Health District at: info@nehalembayhd.org
• Call: Bremik personnel Kevin McMurry: 503-753-1185, Jake Werger: 971-221-5958
or Health District president Marc Johnson: 208-866-6864
• Visit the District website: www.nehalembayhd.org