For the week of: 1/6/2025
What to expect this week:
– First floor interior wall framing at north half of building to be completed
– Second floor framing at north half of building
– Low roof vapor barrier installation
Major milestones on the project:
– Low roof has been framed and sheathed
– First floor wall framing complete at south half of building
– Emergency generator enclosure retaining wall poured
About the new Health Center and Pharmacy:
– The new Health Center and Pharmacy project is a direct result of the five-year strategic plan the Health District adopted in 2019. That plan, now being updated, identified enhanced local health care as a top community priority.
– The new Health Center will have 15 exam and procedure rooms, a major upgrade from the existing facility, allowing space to accommodate specialty services, including x-ray and dental.
– The new Health Center has been designed with energy efficiency and sustainability in mind and will include a solar array, an emergency generator and a variety of energy saving features.
Have questions?
– Email the Health District at: info@nehalembayhd.org
– Call: Kevin McMurry: 503-753-1185, Jake Werger: 971-221-5958 or Marc Johnson: 208-866-6864
– Visit the District website: www.nehalembayhd.org